Simultaneous evacuation
Code of Practice for the Provision of Premises Information Boxes in Residential Buildings, Version 1, published in December 2020 by the Fire Industry Association (FIA) and the National Fire Chiefs Council (NFCC), defines simultaneous evacuation as a: ‘Procedure in which all parts of a block of flats are evacuated following the giving of a common alarm of fire.’
PAS 9980:2022, Fire risk appraisal of external wall construction and cladding of existing blocks of flats – Code of practice, published by BSI Standards Limited in 2022, defines simultaneous evacuation as a: ‘system of evacuation in which an entire building is evacuated immediately on receiving an evacuation signal (e.g. from a fire detection and fire alarm system) or an evacuation alert signal from an evacuation alert system for use by the fire and rescue service, or an instruction to evacuate (e.g. given verbally to the residents of each dwelling by firefighters).’
[edit] Related articles on Designing Buildings
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.